Achievements

No. Project name Work performed Construction period

Pipeline construction

1 “Oil pipeline Tengiz – Novorossisk, CPC system D1016 mm”

Customer:“Starstroi International Caspian Pipeline Consortium (CPC)” LCC
General Contractor:
OJSC “Tatnefteprovodstoy”
work package:.
welding and installation works of d1016 mm oil pipeline of 140 km total length
1999 - 2000
2 “Sakhalin-II Project Onshore Pipeline construction”

Customer:“Sakhalin Energy” LTD
General Contractor: “Starstroi” LCC, “Ekmos” Institute
work package: - gas pipeline d1220 mm (94.2 km) - oil pipeline d630 mm (73.4 km) Semi-automatic welding by «Serimax» complex up to δ=32mm. 2004 - 2009
3 “Baltic Pipeline System (BTS-II). Adjusting. The first start-up complex. Line pipe. (section 476 km -504km)”
Customer: JSC ”MN “Druzhba”
General Contractor: “Stroynovatsiya” LLC
work package: -construction of 1020х11mm main pipeline of 28 km length -construction of the new pipeline in forest swamp land. 2009 - 2012
4 “Construction of “Main Gas Pipeline “Sakhalin-Khabarovsk-Vladivostock” (section 70km-133.9km)”
Customer: “Gazprom Invest Vostock” LLC
General Contractor: “Stroygazmontazh” LLC
work package:
-construction of 1220х24.6 mm main gas pipeline of 63.9 km of total length;
- block valve station, pigs traps, CP, fiber optic communication line -160km, system of geotechnical monitoring, auto roads, helicopter landing decks, radio relay set, 10Kwatt.high voltage line.
2009 - 2013
5 “Construction of “Main Gas Pipeline Onshore processing facilities Kiriskoe GKM – GKS Sakhalin”

Customer:“Gazprom Invest Vostock” LLC
General Contractor:“Stroygazmontazh” LLC
work package:
-construction of 1020х17mm main gas pipeline of 30.6 km length;
-underwater crossings of 22 km length;
-block valve station, pigs traps.
2011 - 2012

Construction of industrial and non industrial buildings and facilities

1 “Construction of Oil Processing and Petroleum Chemical Plants Complex in the city of Nizhnekamsk, RF (underground transfer systems)”

Customer: JSC “TANECO”
General Contractor:“Glavneftegazstroyservice”LLC
work package:
installation of 800 mm fire and 200-300 mm drinking water pipelines and main oil pipeline of Ø720mm and 15.4 km length
2009
2 “Construction of Unified Oil Processing Unit“

Customer: “Sheshma Oil” LLC
General Contractor: JSC “Tatnefteprovodstroy”
work package:
- construction of Unified Oil Processing Unit;
-supply pipelines;
- tanks of V = 500 m3;
-sewage disposal plants;
-cable racks
2010 - 2014
3 1)“Development of the Micro district Block “B” infrastructure, the city of Kazan.
2)“External utilities to the Universal sports complex on Spartakovskaya street in Kazan (Basket Hall) “

Customer: Administrative authorities of the city of Kazan, RT.
General Contractor: OJSC “Tatnefteprovodstoy”
work package with external utilities:
1. street lighting -35 stand lamp;
2. transforming station – 1 unit;
3. distribution point – 1 unit;
4. cable line 6 kV-6420 m of cable;
5. cable line 0.4 kV -5700 m of cable;
6. low-power nets-666 m of cable channels;
7. pressure header D-530 mm - 943 run.m.
8. heating system -1296 run.m.;
9. water supply -1440 m;
10. sewerage -1102 m2;
11. leveling operation –19 thds m3;
12. asphaltic pavement – 1.7 thds m3;
13. stone block -4.5 thds m2;
14. planting – 2.1 thds m2

1. leveling operation -138.2 thds m3;
2. road surface – 29.1 thds m2;
3. planting– 10 thds m2;
4. transforming station – 1 unit;
5.cable system – 10 kV – 2 km;
6. cable system 0.4 kV – 4.3 km;
7. installation of telephones – 2.6 km;
8. water supply– 1 km;
9. sewerage – 4.1 km;
10. sewerage pumping station - 1 unit;
11.gas supply – 2.5 km.

2001 - 2003
4 1)Engineering preparation for construction and redevelopment of the area north-east to the Kazan Kremlin”

2)“Housing estate near the Kazan Kremlin, basements for 38 dwellings”

Customer: JSC “Tatneft”
General Contractor:
OJSC “Tatnefteprovodstoy”
work package:
1. leveling operation -138.2 thds m3;
2. road surface – 29.1 thds m2;
3. planting– 10 thds m2;
4. transforming station – 1 unit;
5.cable system – 10 kV – 2 km;
6. cable system 0.4 kV – 4.3 km;
7. installation of telephones – 2.6 km;
8. water supply– 1 km;
9. sewerage – 4.1 km;
10. sewerage pumping station - 1 unit;
11.gas supply – 2.5 km.


work package:
construction from zero circle (basements for 38 dwellings)
2003 - 2005
5 1)“Hotel facilities “Corston” on Ershova str.”

2)“Enlargement of "Corston -Kazan" hotel facilities (25-storied hotel)”

General Contractor:
OJSC “Tatnefteprovodstoy”
1)work package:
1) house footing foundation, external supply lines, site improvement. Total construction area – 64000m².
2) house footing foundation, external supply lines, site improvement. Total construction area – 25000m². Parking of 20600m² total area
1 stage: 2004 - 2006

2 stage: 2012 - 2013
6 “Redevelopment of the residential complex of JSC «Health and fitness center «Vita» for 63 -storied residential unit “

General Contractor: “Novograd” LLC
work package:
-civil works;
-external supply lines
2005 -2007

Community infrastructure and facilities

1 “Construction of Multiregional Clinicodiagnostic Medical Center”

Customer: Municipal Office Capital Construction Department, the city of Kazan
General Contractor: OJSC “Tatnefteprovodstoy”
work package: a full range of construction and assembly works 1999 - 2007
2 “Administration building for the Ministry of Taxation Inspection Board of the RF for Vakhitovskiy area of the city of Kazan”

Customer: “Federal Tax Service the Russian Federation”
General Contractor: OJSC “Tatnefteprovodstoy”
work package:
-construction of administration building of total area of 13620m² with 1450m².underground parking;
-external supply lines, site improvement, interior finish administration building
2002 - 2005
3 Service-Technical Building of the Federal Security Service of the Russian Federation for the Republic of Tatarstan

Customer: “Federal Security Service of the Russian Federation”
work package:
-construction of administration building of total area of 30670m².
2007 - 2010